Gold Member Since 2015
Audited Supplier
Qingdao Qishengyuan Mechanical Manufacturing Co., Ltd.

Tube Cooling Machine, Cooling Machine, Motorcycle Cooling Machine manufacturer / supplier in China, offering Motorcycle Inner Tube Cooling Tire Machine, China Top Two Roll Mixing Mill Machine for Rubber Mat, 2016 Hot New Type 6 Inch Lab Two Roll Rubber Mixing Mill and so on.

(/ )

Supplier Homepage Product Batch Off Cooling Line Motorcycle Inner Tube Cooling Tire Machine

Motorcycle Inner Tube Cooling Tire Machine

FOB Price: US $5,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $5,000/ Piece
Get Latest Price
Port: Qingdao, China
Production Capacity: 25 Sets Per Month
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: TB-500
  • Control Type: PLC
  • Power Source: Steamed
  • Used for: Rubber Cooling
  • Number of Rolls: 5/6/8/10/12
  • Transport Package: Seaworthy Packing
  • Origin: Qingdao Shandong China
  • Warranty: 2 Years
  • Automatic Grade: Automatic
  • Type: Cooling Machine
  • Model: Xgp-80
  • Trademark: QSY
  • Specification: CE, ISO9001, SGS
  • HS Code: 84778000
Product Description
Motorcycle & E-Bike Inner Tube Cooling Tire Machine

Motorcycle & E-Bike Inner Tube Cooling Tire Machine parameters:
EFFECTIVE WIDTH500
EFFECTIVE THICKNESS1-4MM
COOLING ROLL DIAMETERΦ360X600
POWER1.5KW
LXWXH7000X1600X1700
WEIGHT4700KGS

This Machine is used for inner tube compound layers production and cooling of various electric vehicles and motorcycle tires, meanwhile, it is applicable to thin rubber production.Through combination of a series of cooling rollers, the inner surface temperrature can be meet request.

FQA-Problems of customer concern:
About machine performance quality
1.       Q:  How to guarantee the quality of outsourcing parts?
          A:  First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q:  Which brand of electric part?
          A:  Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3.       Q:  Which PLC:
          A:  Siemens, Omron, Mitsubishi
4.       Q:  How to control the quality?
          A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        Q: When the guide engineer arrive at customer's factory?
           A:  If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        Q:  What is the warranty time?
           A:  2 years after machine arrived at factory
2.        Q:  How to solve the problem?
           A:  Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Send your message to this supplier
Avatar
Mrs. Ida Qiang
*From:
To: Mrs. Ida Qiang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now